Many of Seattle’s older brick buildings are also among its most at risk in an earthquake. The City of Seattle has a program for these unreinforced masonry (URM) buildings. If you own, buy, or lend on one, you need to understand that program. This guide explains what a URM building is, where the city rules stand, and how a seismic evaluation helps.
What makes a building a URM
A URM building has load-bearing walls of brick, block, or stone with little or no steel reinforcing. Many were built before modern seismic codes. In a strong earthquake, the walls can separate from the floors and roof. Parapets and chimneys can fall onto sidewalks.
URM buildings are common in older Seattle neighborhoods. They often hold shops, offices, apartments, schools, and churches.
Seattle’s URM program
The Seattle Department of Construction and Inspections (SDCI) runs a URM program. The city keeps a list of URM buildings. The city also publishes URM building data on its open data site.
Seattle adopted code in November 2024 that recognizes completed URM retrofits. Retrofits are voluntary for now. When the city adopts a mandatory ordinance, critical buildings such as schools and emergency facilities get 7 years to comply, high-risk buildings get 10 years, and all others get 13 years. In 2026, the city cut URM retrofit permit and plan review fees by 50 percent.
The city has identified 1,114 URM buildings. Some have already been retrofitted. Confirm a building’s status in the URM database before you rely on it.
What the pending ordinance could mean
We do not know the final terms yet. But owners should plan for these questions now:
- Will your building need a full retrofit or partial work?
- Will the mandatory ordinance use the city’s 2023 URM Retrofit Technical Standard as written?
- When will the mandatory ordinance pass, which starts the 7 to 13 year clock?
- Will tenants need to move during construction?
A seismic evaluation helps you answer these questions with facts instead of guesses.
Why URM status matters in a deal
URM status can affect price, financing, insurance, and leasing. Each party in a deal looks at it differently.
| Party | Main concern | What helps |
|---|---|---|
| Owner | Future retrofit cost and timing | A seismic evaluation and retrofit concept |
| Buyer | Hidden costs after closing | Evaluation results before the due diligence deadline |
| Lender | Risk to the collateral | Seismic study and repair budget in the loan file |
| Insurer | Earthquake loss risk | Evaluation and any completed retrofit records |
| Tenant | Safety and disruption | A clear retrofit plan and schedule |
A property condition assessment may also flag a building for seismic review. PCAs are mainly visual, so a separate evaluation is often the next step.
What a seismic evaluation includes
The scope depends on your goals and the building. A typical evaluation follows these steps.
- Gather records. Original drawings, past permits, and any retrofit records.
- Visit the building. Look at walls, floors, roof, parapets, and connections.
- Check the wall-to-floor ties. These connections are often the weak point in URM buildings.
- Assess key risks. Parapets, chimneys, openings, and soft first floors.
- Compare to a recognized standard. The engineer uses an accepted method for existing buildings, such as ASCE 41, or the city’s URM Retrofit Technical Standard for Seattle URMs.
- Write the report. List deficiencies and rank them by risk.
- Outline retrofit options. Give a concept and a cost range for planning.
Levels of study
| Level | Purpose | When it fits |
|---|---|---|
| Screening | Quick look to rank risk | Early deal review or portfolio sorting |
| Evaluation | Detailed review of the structure | Before purchase, loan, or retrofit design |
| Retrofit design | Drawings and specs for permit | After you decide to retrofit |
Kee Enviro quotes each level in writing after we see the building and its drawings.
Common URM retrofit measures
Every building is different. These are common measures for planning talks only. Your engineer will set the real scope.
- Bracing or removing parapets and chimneys
- Anchoring walls to floors and roof
- Adding strength to floors and roof so they act as one unit
- Adding new walls or frames to resist shaking
- Strengthening weak first floors with large openings
Questions to ask before you hire
Not every seismic study fits every goal. Ask these questions so you get the right scope.
- What standard or method will you use for the evaluation?
- Will the study meet the city’s expected requirements?
- Do you need original drawings, or can you work without them?
- Will you need to open walls, ceilings, or roof areas?
- Will the report include a retrofit concept and a cost range?
- Can the report support a lender or insurer review?
- Who signs the report, and what license do they hold?
The answers show whether the study will meet your needs. They also help you compare quotes on equal terms.
Planning for tenants and operations
Retrofit work can disrupt tenants. Some measures happen at the roof or from the outside. Others need access to every floor. An early evaluation lets you plan work around leases and phases.
How to plan now
- Check the city list. Search for your building on the Seattle URM page or open data.
- Gather records. Find drawings, permits, and past reports.
- Order an evaluation. Learn the real risks and costs before the ordinance is final.
- Build a budget. Use the evaluation’s retrofit concept to plan capital spending.
- Watch the ordinance. Track city updates so you can adjust your plan.
Buying a URM building
If you are buying, put the evaluation inside your due diligence period. Order it with your Phase I ESA and PCA so one schedule covers all three. Retrofit cost can then go into price talks.
Next step
Get a first read on your building with the seismic quick check. For a full study, see our seismic evaluation service or call Kee Enviro in Federal Way at 206-914-4989.